Blog

EZR curtainchange operation video release.

Miami Design have commissioned a video production to highlight the benefits of the EZR curtain change system, whether installed at the conventional 210cm off finished floor or attached at ceiling height, all curtain/s removal and replacement are completed at waist level, eliminating the need for reaching and use of ladders. This results in minimising numerous OHS issues.

As an AUSTRALIAN MADE product, the EZR produces numerous benefits.

Recent Post

Site Lock

SiteLock

Get In Touch

4/47 Parer Road

Airport West, 

Victoria 3042

Phone : +61.393105155

Email : info(at)miamidesign.com.au